You leave your contacts.
Engineer gathers data: floor plan, concrete thickness and grade, loads, chemicals, operating mode.
Within 24 hours you receive a clear commercial offer with no hidden lines.
We work to the agreed schedule, delivering up to 10,000 m² in 7 days.
We provide system certificates, acts and instructions.
You leave your contacts.
Engineer gathers data: floor plan, concrete thickness and grade, loads, chemicals, operating mode.
Within 24 hours you receive a clear commercial offer with no hidden lines.
We work to the agreed schedule, delivering up to 10,000 m² in 7 days.
We provide system certificates, acts and instructions.
Completed projects
of epoxy floors in Uzbekistan

- System: concrete dust-proofing
- Timeline: 10 days
- Result: The plant received a level, reinforced, dust-free surface that handles heavy loads, simplifies cleaning and improves safety




- System: 1 mm epoxy self-leveling floor
- Timeline: 1 month
- Result: Eco-friendly floor that fully removes dusting and creates a clean, commercial finish

- System: 2 mm epoxy self-leveling floor
- Timeline: 15 days
- Result: We strengthened the screed and leveled the surface with a two-layer epoxy system
Documents and standards
System selection for your loads
Frequently asked questions
An epoxy self-leveling floor is a seamless polymer coating based on epoxy resin applied to a prepared concrete base. Unlike ordinary concrete it does not dust, does not absorb oils or chemicals, cleans easily and withstands high mechanical loads. That is why epoxy industrial floors are common in warehouses, parking lots, factories and logistics centers.
The cost depends on substrate condition, layer thickness, system type (dust-proofing, 1 mm, 2 mm and above) and site area. Concrete dust-proofing starts from $5/m², 1 mm epoxy coatings from $8/m², reinforced systems for aggressive environments from $14/m². We calculate the exact price after site inspection and measurements.
Pedestrian load is possible after 24 hours. Light equipment and forklifts are allowed after 3–5 days, full operation after 5–7 days. Timing depends on the chosen system and room temperature.
With the right system and operating conditions, an epoxy floor lasts on average 7–10 years or more. We tailor the coating to the load, chemistry and cleaning approach. We provide warranties up to 10 years in the contract.
Epoxy coatings fit warehouses, logistics centers, production shops, parking lots, car services, food and chemical plants, laboratories, sports complexes, malls and other commercial facilities. Each load type gets a dedicated system.